IQ Digital Engineering Experts Prominent at Aveva Day
As Australia’s leading Digital Engineering consultancy, it was great to hear Aveva’s Digital Engineering and Engineering Information plans and aspirations at the recent Aveva days.
As Australia’s leading Digital Engineering consultancy, it was great to hear Aveva’s Digital Engineering and Engineering Information plans and aspirations at the recent Aveva days.
Information Quality were engaged by a world leader in the energy transition to develop a suite of Control of Work processes.
The revised processes take the best elements from multiple existing businesses and streamline, align and modify the content and process to enable the transition from bulk materials handling to the operation of Major Hazardous facilities.
Information Quality were engaged to assist Arrow Energy in the specification of functional requirements for the B2 power station water treatment plant life extension project. Demineralised water is utilised in the gas fired power turbines to boost power output. An operate phase reliability, availability, and maintainability (RAM) study was conducted to reflect current plant performance and to identify improved functional requirements to facilitate optimised power output and efficiency.